HS2 Thames
Water Sleeves
Our package included installing concrete Thames Water sleeves within concrete encasements underneath the main HS2 Railway.
- Date: Mar 2023 – Completed
- Client: Clancy | EKFB
- Project Type: Installation
About this Project
The utility works covered the permanent diversion of the Thames Water foul sewer main near Stoke Mandeville – a total length of 166m.
The works required permanent usage of a crane, due to the limited space in the excavation.
More Projects
Ilford RC Frame
Hatch side school was a new development incorporating an extension for the school
Ipswich Project X Ware house Unit
Project X was the development of one large warehouse unit ...
Maidenhead Multi-story Car Park Development
This project included groundworks, reinforced concrete structures ...
Jays Close Basingstoke Warehouse Unit
This is an extremely complex project with many factors including a 6m retaining wall splitting the site into two ...
East Street Reading Student Accommodation
This project was a newly developed large block of student accommodation in East Street in Reading ...