A4010 Stoke Mandeville Bypass Overbridge
Works included constructing 2 no. Overbridge Abutments, each one divided into 5 no sections.
- Date: Jul 2023 – present
- Client: HS2
- Project Type: SMOB
About this Project
Works included installing a Bypass Overbridge Abutment above the main HS2 Railway. This involved constructing 2 no. Overbridge Abutments, each one divided into 5 sections. The total reinforcement tonnage reached over 550 tonnes and the total concrete volume reached over 2800 m3
The works required the highest concrete finish level, which we achieved using Peri Panel System as a formwork.
All works were completed with the highest level of health & safety standards.


More Projects
Ilford RC Frame
Hatch side school was a new development incorporating an extension for the school
Ipswich Project X Ware house Unit
Project X was the development of one large warehouse unit ...
Maidenhead Multi-story Car Park Development
This project included groundworks, reinforced concrete structures ...
Jays Close Basingstoke Warehouse Unit
This is an extremely complex project with many factors including a 6m retaining wall splitting the site into two ...
East Street Reading Student Accommodation
This project was a newly developed large block of student accommodation in East Street in Reading ...