Some of our projects
Aylesford industrial & logistics unit for Amazon
Aylesford industrial & logistics unit for Amazon consisted of the construction of a multi-use warehouse, van park and car park.
Silvertown Tunnel Infrastructure Works
Silvertown Tunnel consists of 2no (north and south) 1.4km tunnels that are being constructed within London.
HS2 Culvert Installation
Pre-cast Reinforced Concrete Installation 7 in-situ concrete wall installation
M25 J28 Redi Rock
Redi-Rock Retaining Wall system at Junction 28 of the M25 Orbital.
M25 J28 RECo-Walls
Successfully completed the installation of 13no of RECo-Walls Structures at Junction 28 of the M25 Orbital.
Jays Close Basingstoke Warehouse Unit
This is an extremely complex project with many factors including a 6m retaining wall splitting the site into two …
A4010 Stoke Mandeville Bypass Overbridge
Installing Bypass Overbridge Abutment above main HS2 Railway.
HS2 Thames Water Sleeves
Installing concrete Thames Water Sleeves in concrete encasement under the main HS2 Railway.
Aylesford Ditton Brook North & South
Removing existing pond and creating new stream channel. Works included installing flood defence system
Ilford RC Frame - New Development
Hatch side school was a new development incorporating an extension for the school bespoke for disabled children.
East Street Reading Student Accommodation
This project was a newly developed large block of student accommodation in East Street in Reading …
Maidenhead Multi-story Car Park Development
This project included groundworks, reinforced concrete structures …
Wendy Residential House Project
The project was to construct 10 new high spec residential homes …